WSJ worked on multiple projects over the span of 3-4 years for Toyo. Projects ranged from demo/replacement of existing equipment foundation to ground up new construction. Services provided included site prep work, demolition of existing concrete, foundations, equipment pads/foundations, SOG, slab on metal deck, sidewalks, pipe bollards, fabrication/installation of steel columns/beams/bollards, CMU work, trench drains, floor patches, final site grading and concrete paving.
Services: Concrete and Masonry
Contractor: KBD Group
Location: White, GA